Switch language:Simplified Chinese | English

Professional aluminum plate production and wholesale manufacturer

We have been focusing on customized design of aluminum veneer for many years, and choosing us is not wrong!

Information Hotline:

+86 15627778610

Jinba Aluminum Industry (Guangdong) Co., Ltd

Industry information

Company News

Industry dynamics

Frequently asked questions

contact us

Mobile:+86 15627778610

Email: 2201229786

Address: No. 5 Binjiang Road, High tech Zone, Zhaoqing City, Guangdong Province

Construction site report on 2mm aluminum veneer

  • Author: Jinba Aluminum Industry (Guangdong) Co., Ltd
  • Release time: March 6, 2025 00:03:51
  • Click:0

2mm铝单板的施工现场实况报道



2mm aluminum veneer is a commonly used building decoration material, and its construction site conditions have attracted much attention. The following will provide a detailed introduction to the construction site of 2mm aluminum veneer from multiple aspects.

1、 Construction preparation

Before carrying out the construction of 2mm aluminum veneer, sufficient preparation work is required. It is necessary to clean and organize the construction site to ensure that it is clean and tidy; Need to prepare the necessary tools and equipment, including electric drills, chainsaws, corner codes, etc; It is necessary to inspect and test the 2mm aluminum veneer to ensure its quality meets the requirements.

2、 Installation steps

1. Measurement and cutting

Before installing the 2mm aluminum veneer, it is necessary to measure and cut it first. According to actual needs, use an electric drill or saw to cut and process 2mm aluminum veneer according to design requirements.

2. Install corner code

When installing 2mm aluminum veneer, corner brackets are required to secure its position. Drill holes on the wall, then insert the corner code into the holes and secure it with screws.

3. Install the keel

When installing 2mm aluminum veneer, it is necessary to use keel to reinforce its stability. Drill the keel holes on the wall, then place the keel into the holes and fix it with screws.

4. Install 2mm aluminum veneer

When installing 2mm aluminum veneer, it needs to be placed on the keel and fixed with screws. Pay attention to maintaining the position of the 2mm aluminum veneer flat and vertical.

3、 Precautions

When carrying out the construction of 2mm aluminum veneer, attention should be paid to safety issues to avoid accidents.

Before installing 2mm aluminum veneer, it is necessary to conduct sufficient inspection and testing to ensure that its quality meets the requirements.

When installing 2mm aluminum veneer, appropriate tools and equipment need to be used to ensure construction effectiveness and quality.

4、 Summary

The construction site of 2mm aluminum veneer includes aspects such as construction preparation, installation steps, and precautions. In the future development, we should strengthen technological research and improvement, promote the concept of green buildings, adopt more environmentally friendly and sustainable building materials and technologies, and jointly build beautiful homes.